Needs Assessment

  CONCEPT PLAN ALTERNATIVES are prepared to clarify facility needs and requirements. Concept plans consist of scaled floor plans that articulate critical spatial relationships and establish feasibility and the magnitude of needed construction. Alternatives may involve new buildings, additions to existing buildings, or existing space reallocations. A concept plan is usually preceded by a facility utilization analysis and is often part of a broader reuse study; and provides the basis for a cost analysis.

Facility Database
Reuse Study
Utilization Analysis
Peer Comparison
Modeling
Concept Plan Alternative
Design Criteria
Cost Analysis
Facility Program Summary
Budget Targeting